EAC Ready to Repair Fire Damage in Limassol Mountainous Region

The Electricity Authority of Cyprus (EAC) is on standby to repair the damage caused by the recent fire in the mountainous region of Limassol. With an operations center set up outside Vasa Koilaniou, the EAC has transported materials and is ready to immediately begin work in 7 affected communities.
EAC Spokesperson Christina Papadopoulou told CY News Agency that the EAC is fully prepared to repair the damages.